top of page
Writer's pictureOneStep Power

A Perfect Voltage Dip Ride Through Test


It's been a long, fruitful summer and here it is, the post we have all been waiting for! We're excited to present the graph below which shows our final pre-production GVRT prototypes, for multiple generators on a single buss-bar, completing a voltage dip ride through test.

 

Voltage Dip Ride Through Test

 

This is a game-changing moment in dynamic positioning power systems. With this technology OneStep Power are now able to provide safe, reliable and repeatable testing to prove closed-buss operating configurations.


The team have mastered a challenging environment of hardware and software design, bringing many components together to achieve this amazing result. We're so proud of the OneStep Power team!

191 views0 comments

Comments


bottom of page